| Fabrication of flue gas ducts for Walsum/Steag EVONIC (2008)Fabrication of flue gas ducts for Fiddler’s Ferry (2007) | 
1000 t  430 t | 
 
 
 | 
|   | 
 | 
|     THYSSEN KRUPP, Germany (2007) | 
| Fabrication and erection of transport comveyors, mine eqyuipment, excavator boom, self-moving belts | 
150 t    | 
 
 
 | 
|   | 
 | 
|     TAKRAFF, Germany (2007) | 
| Fabrication and erection of mine equipment, excavator, etc. | 
90 t | 
 
 
 | 
|   | 
 | 
|     CAEFER-RACO Eng, Germany (2000-2003) | 
Fabrication of gas-turbine exhaust systems         Hay Road, USA         Project Benghazy, Libya         Project Iran | 
  3 systems  1 system  2 divert. | 
 
 
 | 
|   | 
 | 
|     DEMAG, Germany (2000) | 
Fabrication of steel structure for Demag overhead cranes  Fabrication of equipment for overhead cranes | 
200 t  50 t | 
 
 
 | 
|   | 
 | 
|     HIGOT KANE Ltd, Canada (1999-2005) | 
Fabrication of gas-turbine exhaust systems         Project Eisenhuttenstadt, Germany         Project Azito, Ivory Coast         Project Zawia, Libya         Project Komatini, Greece | 
  1 system  2 systems  4 systems  2 systems | 
 
 
 | 
|   | 
 | 
|     NUOVO PIGNONE, Italy (1999) | 
| Fabrication of base planes for gas turbines | 
8 pcs | 
 
 
 | 
|   | 
 | 
|     BACHMAN Ind. Inc, USA (1998-2004) | 
Fabrication of gas-turbine exhaust systems         Project Ivory, Coast         Project Rades, Tunysia         Project Zawia, Libya         Project Komatini ,Greece | 
  2 systems  2 systems  4 systems  2 systems | 
 
 
 | 
|   | 
 | 
|     Power plant REK-Bitola, 3x225MW, Bitola, Macedonia () | 
Design, fabrication and erection of two roto earth removing excavators, parts of mechanical equipment  Fabrication and erection of excavator  Fabrication and erection of steel structure for electrostatic ash precipitators  Fabrication and erection of mechanical equipment for electrostatic ash precipitators  Gabrication and erection of ash removing system  Erection of boiler and boiler equipment  Design, fabrication and erection of conveyors  Erection of steel structure for machine building  Fabrication of operating wheel for excavator  Fabrication of operating booms for excavators | 
1100 t    140 t  520 t  650 t  85 t  1880 t  3400 t  4000 t  150 t  1000 t | 
 
 
 | 
|   | 
 | 
|     STEIN Industry, France () | 
| Fabrication of steel drums for thermoelectric power plant | 
550 t | 
 
 
 | 
|   | 
 | 
|     Power plan REK Oslomey, 120 MW, Macedonia () | 
Erection of mechanical equipment  Erection of mechanical conveyors  Fabrication and erection of  mine equipment, excavator,   self-moving belts  Fabrication of elements for bucket excavator | 
8000 t  800 t  600 t    100 t | 
 
 
 |