FERRONICKEL, Glogovac, Kosovo (2007)
      DELTA Engineering, Belgrade, Serbia (2007)
| Fabrication of steel structure for cement factory Holcim, Serbia | 
460 t | 
      IRONWORKS Smederevo, Smederevo, Serbia ()
      REFRIGERATORS, China ()
| Design and fabrication of steel structure for refrigerators 1500t, 2000t and 3000t capacity  | 
400 t | 
      CHAMOTOLY, Poland ()
Fabrication of steel structure for oil and margarine factory  Covering and cladding | 
100 t  50000 m2 | 
      HASLINGER, Austria ()
| Fabrication of steel structure for production hall | 
600 t | 
      MOSKVICH IV phase, Moscow, Russia ()
| Fabrication of steel structure for production halls | 
4200 t | 
      COOLERS, Russia ()
Fabrication of galvanized steel structure for cooler 13x50t, Moscow  Fabrication of galvanized steel structure and supervision during construction of coolers 500t  Fabrication of galvanized steel structure for cooler 5000t, Tbilissy | 
450 t   950 t    920 t | 
      Wood panels factory, Norilsk, Russia ()
| Design, fabrication and erection of steel structure | 
1200 t | 
      Project F-946 (1st & 2nd phase), Baghdad, Iraq ()
Design, fabrication and erection of steel structure  Covering and cladding  Supply and erection of 80t capacity cranes | 
3300 t  58000 m2  58 pcs | 
      Cement factory RABAK, Sudan ()
| Fabrication and erection of steel structure | 
1220 t | 
      Line for prefabricated concrete elements, Kuwait ()
Design, fabrication and erection of portal cranes         3 pcs of 10t capacity         1 pc of 5t capacity | 
   69 t  10 t | 
      IRONWORKS Jesenice, Jesenice, Slovenia ()
| Design, fabrication and erection of steel structurе | 
4500 t | 
      SHIPYARD Bijela, Montenegro ()
Fabrication and erection of steel structure for production hall  Covering and cladding with sandwich panels | 
1360 t  26000 m2 | 
      MZT-FAM, Skopje, Macedonia ()
| Workshop drawings and fabrication of steel structure for the production hall | 
1000 t | 
      STEELMAKING PLANT Tripoly, Tripoly, Libia ()
| Design, fabrication and erection of steel structure for the production hall | 
1150 t | 
      CELULOSE FACTORY, Cameroon ()
| Design and fabrication of steel structure and supervison during erection | 
3000 t | 
      ARESCO CENTRE, Beirut ()
| Design, favrication and erection of steel structure | 
900 t | 
      Mine and steelforks SKOPJE, Skopje, Macedonia ()
Fabrication and erection of steel structures for the production halls  Fabrication and erection of processing equipment  Erection of equipment | 
30000 t  4500 t  19000 t | 
      Cooper mine BUCHIM, Radovish, Macedonia ()
Design, fabrication, purchasing and erection of steel structures and equipment         Steel structures         Covering and cladding         Processing equipment         Mining equipment         Imported equipment         Domestic equipment         Fabrication for dumper buckets up to 120t | 
    2300 t  14500 m2  600 t  1500 t  1400 t  2000 t  200 t | 
      FENI Kavadarci, Kavadarci, Macedonia ()
Design, fabrication and erection of steel structure  Covering and cladding | 
4200 t  90000 m2 | 
      Zinc and lead minting plant ZLETOVO, Veles, Macedonia ()
Fabrication and erection of steel structure  Erection of domestic and imported equipment | 
4000 t  6000 t | 
      Mechanical service ZIK SKOPSKO POLE, Skopje, Macedonia ()
| Fabrication and erection of steel structure | 
410 t | 
      Cement factory USJE, Skopje, Macedonia ()
Fabrication and erection of steel structure for the factory extension  Erection of equipment  Fabrication and erection of precipitators | 
450 t   1700 t  500 t | 
      Chocolate factory EVROPA, Skopje, Macedonia ()
Design, fabrication and erection of steel structure  Covering and cladding  Erection of the equipment | 
470 t   10000 m2  200 t | 
      HEK JUGOHROM, Jegunovci, Macedonia ()
Fabrication and erection of steel structure  Covering  Erection of equipment | 
1230 t  10000 m2  300 t | 
      Mashine industry ILR Zeleznik, Serbia ()
Fabrication and erection of steel structure for production halls  Covering and cladding | 
2000 t  21000 m2 |